Products

Composting Technology that Reduces Cost and Complexity While Meeting Compliance

Covered or Uncovered?


Let us show you how any uncovered Aerated Static Pile can be converted for use with the GORE® Cover System

Get In Touch

SG MobileTM

This simple, low-cost option is the best solution for your demonstration/pilot project, small system or community composting needs. We teach you how to secure feedstocks, compost, comply and find end-user markets before you invest in a full-scale system. For some, this is a final solution.

Learn More

SG MobileTM

The Sustainable Generation (SG) team fully supports you the whole way through – mobilization, configuration, on-site support and operational support. A quality product that meets all regulations, with a report to prove it, is all part of the SG Mobile™ offering. There is no need to invest in costly infrastructure or find end markets without assistance. With SG’s expertise and guidance, the whole process is simple, fast, economical and efficient – and we can help you scale up if that is what is intended to come next for you.

Learn More

  • 100 or 250 tons per batch
  • Multiple systems can be used together for continuous processing capacity
  • Leachate collection & management
  • Moisture management
  • Meets compliance
  • Solar power option
  • Process cycle time – up to 8 weeks
  • Very small footprint and mobile – yes, it can be moved!
  • Aeration – above or in ground
  • All feedstocks
  • Effective in all climate conditions
  • Low energy requirement – can run on 110/240/480 volt power

The Sustainable Generation team provided us with outstanding hands-on assistance as we learned to use their system. We retrofit our existing positive air ASP system, which used a compost cap, by upgrading to the SG Mobile™ System with GORE® Cover so we could address environmental and community concerns about odors and vector control, and also so we could scale up and expand our composting operation.

Justin Green, Executive Director & Founder Big Reuse

Want to Learn More?

Get Started

SG MobileTM

This simple, low-cost option is the best solution for your demonstration/pilot project, small system or community composting needs. We teach you how to secure feedstocks, compost, comply and find end-user markets before you invest in a full-scale system. For some, this is a final solution.

  • 100 or 250 tons per batch
  • Multiple systems can be used together for continuous processing capacity
  • Leachate collection & management
  • Moisture management
  • Meets compliance
  • Solar power option
  • Process cycle time – up to 8 weeks
  • Very small footprint and mobile – yes, it can be moved!
  • Aeration – above or in ground
  • All feedstocks
  • Effective in all climate conditions
  • Low energy requirement – can run on 110/240/480 volt power

The Sustainable Generation team provided us with outstanding hands-on assistance as we learned to use their system. We retrofit our existing positive air ASP system, which used a compost cap, by upgrading to the SG Mobile™ System with GORE® Cover so we could address environmental and community concerns about odors and vector control, and also so we could scale up and expand our composting operation.

Justin Green, Executive Director & Founder Big Reuse

SG HeapTM

For those who require full-scale production to meet organics recycling needs of 10,000 tons and up, this option has it all. The SG Heap™ also makes it simple to convert your current open windrow method to the GORE® Cover system to ease operation and cost and meet compliance.

Learn More

SG HeapTM

For those who require full-scale production to meet organics recycling needs of 10,000 tons and up, this option has it all. The SG Heap™ also makes it simple to convert your current open windrow method to the GORE® Cover system to ease operation and cost and meet compliance.

Learn More

  • Easily scalable – 10,000 tons to infinity
  • Leachate collection & management
  • Moisture management
  • Meets compliance
  • Process cycle time – up to 8 weeks
  • Small footprint
  • In-ground Aeration
  • All feedstocks
  • Effective in all climate conditions
  • Low energy requirement

Want to Learn More?

Get Started

SG HeapTM

For those who require full-scale production to meet organics recycling needs of 10,000 tons and up, this option has it all. The SG Heap™ also makes it simple to convert your current open windrow method to the GORE® Cover system to ease operation and cost and meet compliance.

  • Easily scalable – 10,000 tons to infinity
  • Leachate collection & management
  • Moisture management
  • Meets compliance
  • Process cycle time – up to 8 weeks
  • Small footprint
  • In-ground Aeration
  • All feedstocks
  • Effective in all climate conditions
  • Low energy requirement

SG BunkerTM

If you need to meet an even higher level of environmental compliance than is offered with the SG Heap™ because of extreme rain or snow conditions, or you have site constraints, the bunker option gives you all the benefits of the heap, with the assurance of an even higher level of protection.

Learn More

SG BunkerTM

If you need to meet an even higher level of environmental compliance than is offered with the SG Heap™ because of extreme rain or snow conditions, or you have site constraints, the bunker option gives you all the benefits of the heap, with the assurance of an even higher level of protection.

Learn More

  • Easily scalable – 10,000 tons to infinity
  • Leachate collection & management
  • Moisture management
  • Meets compliance
  • Process cycle time – up to 8 weeks
  • Small footprint
  • In-ground Aeration
  • All feedstocks
  • Effective in all climate conditions
  • Low energy requirement

We had no composting experience so conducting a demonstration project with Sustainable Generation greatly enhanced our understanding of food waste composting and helped us immensely with our subsequent expansion design process. It really made a difference, during the selection process, that SG’s technology was already a proven solution for meeting VOC emission reductions for our San Joaquin Valley Air Pollution Control District.

Jonathan Kalpakoff, Vice President Mid Valley Disposal.

Want to Learn More?

Get Started

SG BunkerTM

If you need to meet an even higher level of environmental compliance than is offered with the SG Heap™ because of extreme rain or snow conditions, or you have site constraints, the bunker option gives you all the benefits of the heap, with the assurance of an even higher level of protection.

  • Easily scalable – 10,000 tons to infinity
  • Leachate collection & management
  • Moisture management
  • Meets compliance
  • Process cycle time – up to 8 weeks
  • Small footprint
  • In-ground Aeration
  • All feedstocks
  • Effective in all climate conditions
  • Low energy requirement

We had no composting experience so conducting a demonstration project with Sustainable Generation greatly enhanced our understanding of food waste composting and helped us immensely with our subsequent expansion design process. It really made a difference, during the selection process, that SG’s technology was already a proven solution for meeting VOC emission reductions for our San Joaquin Valley Air Pollution Control District.

Jonathan Kalpakoff, Vice President Mid Valley Disposal.

Want to Learn More?

Get Started

Let's talk about what might be right for you.